Conceptual Plan
- Master plan for biotech/pharmaceutical facilities, research and development centers and semiconductor manufacturing.
- Designed and approved interchange with direct access to I-295.
- Abundant water and waste water supply — 10 mgd water capacity to MTP available.
- Dual feed 230kV low cost, high reliability electric transmission service to MTP.
- Establishment of a satellite location for the Virginia Bio-Technology Research Park at Meadowville to facilitate research partnerships with Virginia Commonwealth University.
- Three miles from a gas separation plant suitable to pipe gas directly to site.
- IDC of Portland, Oregon conducted a thorough review of the MTP site as if a chip manufacturer were evaluating a potential fab site. This study found that electric costs here were among the lowest in the United States for existing fab locations. An Executive Summary of this study is available.
Proposed Master Plan
View the entire Meadowville Technology Park Design Guideline document.
Copyright ©2007 Meadowville Technology Park, All Rights Reserved.